Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (Darkly)
  • No Skin
Collapse
Brand Logo
  1. Home
  2. Uncategorized
  3. Adaptation is 100% necessaryMost adaptation plans are way behind scheduleThis is all coming at us faster than expectedWe are completely unprepared

Adaptation is 100% necessaryMost adaptation plans are way behind scheduleThis is all coming at us faster than expectedWe are completely unprepared

Scheduled Pinned Locked Moved Uncategorized
climatecrisis
2 Posts 2 Posters 0 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • Peter du ToitP This user is from outside of this forum
    Peter du ToitP This user is from outside of this forum
    Peter du Toit
    wrote last edited by
    #1

    Adaptation is 100% necessary
    Most adaptation plans are way behind schedule
    This is all coming at us faster than expected
    We are completely unprepared

    And there is also this
    ALL adaptation has limits
    At 3ºC most of life on earth will be hitting those limits

    #ClimateCrisis

    https://www.theguardian.com/environment/2026/feb/16/europe-climate-advisory-board-3c-global-heating

    Juho MäntysaloI 1 Reply Last reply
    1
    0
    • Peter du ToitP Peter du Toit

      Adaptation is 100% necessary
      Most adaptation plans are way behind schedule
      This is all coming at us faster than expected
      We are completely unprepared

      And there is also this
      ALL adaptation has limits
      At 3ºC most of life on earth will be hitting those limits

      #ClimateCrisis

      https://www.theguardian.com/environment/2026/feb/16/europe-climate-advisory-board-3c-global-heating

      Juho MäntysaloI This user is from outside of this forum
      Juho MäntysaloI This user is from outside of this forum
      Juho Mäntysalo
      wrote last edited by
      #2

      @peterdutoit

      Doesn't really surprise me that the same people who didn't want to pay for green energy, also didn't want to pay for the cost of using fossil fuels.

      1 Reply Last reply
      0
      • R ActivityRelay shared this topic
      Reply
      • Reply as topic
      Log in to reply
      • Oldest to Newest
      • Newest to Oldest
      • Most Votes


      • Login

      • Don't have an account? Register

      • Login or register to search.
      Powered by NodeBB Contributors
      • First post
        Last post
      0
      • Categories
      • Recent
      • Tags
      • Popular
      • World
      • Users
      • Groups